参考文献
1.W.E.Gates,M.Morden,Professional Structural Engineering EXperien Related to Welded Steel Moment Frame F0llowing tbe Northridge Earthquake.The Structural Design of Tall Building,Vo1.5,29-44(1996)
2.Interim guidelines:Evaluation,Repair,Modiflcation and Design of Steel Moment Frames,Report No.SAC- 95-02,SAC Joint Venture一
3.M.D.Engelhardt and t.A.Sabot,Seismic-resistant steel moment connect ions:deVelopment since the l994 Northridge earthquake,Construction Research Communicatons Limited,1997 ISSN,1365-0556
4.E.P.Popov,T.S.Yang,S.P.Chang,Design of steel MRF Connections before and after 1994 Northridge earthquake. 5.A.Whittaker,A.Gilani,V Bertero,Evaluation of Pre-Northridge steel moment-resisting frame joints,The Strctural design of tall Buildings,7,1998,263-283
6. AISC Seismic Provisions for Structural steel buildings,April 15,1997
7.田中淳夫,梁端混合连接,建筑技术(日),1994,9
8.本建筑学会,铁骨构造技术指针(JASS 6),1996
9.日本建筑学会,铁骨工事技术指针——工场制作编,5.16新技术·新工法介绍,1996
10.吴志超,框架梁刚性连接焊接节点,钢结构,1997,3
11. B.S.Taranath,Steel,Concrete,composite Design of tall Buildings,second edition,McGraw-Hill,965-975
12.蔡益燕,美国钢框架节点抗震设计研究动向,高层建筑抗震技术交流会论文集,1997.11.9-11.12 P187-196,广东·珠海,中国抗震防灾研究会·高层建筑抗震专业委员会
来源:考试大-建筑工程类考试责编:wql 纠错